Our team was tasked with performing inspection and maintenance work on the 146m aluminium smelter chimney.
The concrete structure requires regular inspection and various maintenance tasks (concrete structure inspections, coverage surveys, and repairs), which are not practicable by any other means but rope access.
This method also allowed for movement onto different portions of the stack as the weather or task changes, with no equipment left exposed.