Rail Bridge 19, Midland Line

Through 2018-2019 Abseil Access carried out a detailed structural inspection, major bolting replacement and painting campaign. While there we also removed approximately 400m of rail system material from the lower chord where a new walkway is due to be installed. This was safely completed in 7 working days.

Overcoming alpine weather conditions our Bridge maintenance team complete this work with zero incidents and absolutely no delays to rail activity.